Products

Location:

Positive pressure air supply outlet
The positive pressure air outlet valve body forming production line consists of material rack,leveling,hydraulicshearing, punching square mouth,punching sharp comer,punching round hole,valve body forming machine,bending machine and hydraulic shearing.It adopts full computer PLC control and touch screen operation,and can be set to any size
according to the operation requirements.The pressure air supply frame frame is fully automatic production,which greatly improves the production efficiency and is suitable for use in fire damper production plants.
-+

1. Function                description:

 Double servo motor,full automatic operation

 finished damper frame width:200-320mm

flange edge molding15mm

 processing mode: Lsh ape/shape/sheet

 Output:500pieces frame/8hours

 Meet 3C standard

2 .  Basic         Equipment:

 Motor decoiler one set

 Leveling device one set

 Punching big mouth die,small mouth die four sets

 Punching on-off installation hole die one set

 Punching blade installation hoe die one set

 Hydraulic Cutting device one set

Main roll forming machine one set

 Hydraulic bending device one set

 PLC  one  set

 Feeding platform one set


     technical parameter

加工厚度Capacity

1.5-2.0mm

材质Material

镀锌板/黑铁板Galvanied steel/Black iron

卷料宽度Coiler width

240mm

卷料重量Coil Weight

≤3000kg

工作速度Work speed

≤10m/min

长度误差Length error

±0.5mm

对角线误差Diagonal error

±1mm

外形尺寸Dimension

14×1×1.3m

重量Weight

8000kg

总功率Power

22kw


Quality and After-sale Assurance

Our company has a modern scientific research center, advanced production equipment and industry talents. Through continuous innovation, it has always been in the leading position in the industry. The Kunjiu team continues to meet the needs of the market through joint efforts.

We promises that the name, model, specification and quantity of the equipment comply with the technical agreement. Guarantee that the equipment is excellent in craftsmanship, free from defects in design, materials, and workmanship, and meet customer needs.

we will provide service on installation and commissioning , no worry about after sales.

All equipment is delivered after passing the quality inspection and debugging.

Trade Term

Price Terms: EXW, FOB, CIF
Payment Terms: 30% as deposit, and 70% before delivery
Lead Time: 20-90 days depends on machine size and quantities

Some customers are as follows

customers

Online Consultation

In order to provide you the suitable machine , pls offer below message for us

》What is the workpiece? What material does it made of? and shape ?
》The Max. Length/Width/Height of the workpiece
》The Max./Min.Weight of the workpiece 
》The output of blasting ( how many tons or pcs per day) 
》The power supply ( China :380V, 3PH, 50HZ)  
》Better to send us the workpiece photo or drawing.

Submit